Prep and spray
Plaster inspection, machine sanding and filling, masking, a full primer coat, then spray-applied finish coats to walls and ceilings.
Spray-finish painting for multi-house developments and one-off homes across Galway, Clare and Limerick. Owner-led, planned around your programme, and signed off room by room.
Phase 1 and Phase 2 planned around plastering, joinery and handover dates, with early warning if anything on site will hold us up.
A checklist for every room in every house, so you always see what is done, what is next and what is snagged.
Dust-controlled sanding and full masking of windows, floors and fittings, so other trades' work stays untouched.
Jucelino prices, plans and inspects every project himself. One number to call, from walk-through to final snag.
The same defined process on a single one-off home or a full development, so the tenth house finishes like the first.
Plaster inspection, machine sanding and filling, masking, a full primer coat, then spray-applied finish coats to walls and ceilings.

After second fix: colour coats, skirting, architraves, doors and staircases, plus feature walls and wallpaper, with sharp lines throughout.

Every room walked against its checklist, snags closed before handover, and each house signed off with your site manager.
Every project starts the same way: a proper assessment of the plaster, the surfaces and what each house actually needs.
Panelling, staircases, high ceilings, feature colour and wallpaper, with floors and fittings protected until the last coat is dry.








Before
After
During
After
Phase 1, Phase 2 and snagging across Houses 10 to 14, each house tracked room by room so the site team always knows where painting stands.
[Two sentences from the Roche Group site manager on quality, tidiness and keeping to programme.]
Site managers get a simple progress report: each house, each phase, and any open snags. Shared weekly, or whenever you ask.
| House | Phase 1 | Phase 2 | Snagging |
|---|---|---|---|
| House A | Done | Done | 2 open |
| House B | Done | In progress | Not started |
| House C | In progress | Not started | Not started |
Everything your QS or safety officer asks for, sent before we start.
Multi-house schemes finished to one consistent standard, house after house.
A painting subcontractor who turns up when planned and hands over clean.
Specified finishes delivered as drawn, for clients who notice the detail.
Large one-off homes, priced fully up front and finished to a high-end standard.
Tell us about the scheme. We come to site or your office, walk the drawings, and return a full Phase 1 to handover price.